{"id":2600,"date":"2021-04-22T04:39:00","date_gmt":"2021-04-22T04:39:00","guid":{"rendered":"https:\/\/tpsonline.com.au\/wordpress\/?page_id=2600"},"modified":"2021-05-24T03:59:52","modified_gmt":"2021-05-24T03:59:52","slug":"csdp-coaxial-service-delivery-point-installation","status":"publish","type":"page","link":"https:\/\/tpsonline.com.au\/wordpress\/project-experience\/csdp-coaxial-service-delivery-point-installation\/","title":{"rendered":"CSDP (Coaxial Service Delivery Point) Installation &#8211; S10"},"content":{"rendered":"<!--themify_builder_content-->\n<div id=\"themify_builder_content-2600\" data-postid=\"2600\" class=\"themify_builder_content themify_builder_content-2600 themify_builder tf_clear\">\n    \t<!-- module_row -->\n\t<div  data-lazy=\"1\" class=\"module_row themify_builder_row tb_v98g407 tb_first clearfix\" >\n\t    \t\t<div class=\"row_inner col_align_top tf_box tf_w tf_rel\">\n\t\t\t<div  data-lazy=\"1\" class=\"module_column tb-column col-full first tb_9s6r408 tf_box\">\n\t    \t    \t        <div class=\"tb-column-inner tf_box tf_w\">\n\t\t    <!-- module text -->\n<div  class=\"module module-text tb_735y363   \" data-lazy=\"1\">\n            <div  class=\"tb_text_wrap\">\n    <h1 style=\"text-align: center;\">CSDP (Coaxial Service Delivery Point) Installation<\/h1>    <\/div>\n<\/div>\n<!-- \/module text --><!-- module image -->\n<div  class=\"module module-image tb_se5j408   image-top tf_mw\" data-lazy=\"1\">\n            <div class=\"image-wrap tf_rel tf_mw\">\n\t\t    <img data-recalc-dims=\"1\" decoding=\"async\" data-src=\"https:\/\/i0.wp.com\/tpsonline.com.au\/wordpress\/wp-content\/uploads\/2021\/05\/Projects-10.1.webp?w=1000&#038;ssl=1\" alt=\"\"   src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" class=\"lazyload\">\t\n\t\t<\/div>\n\t<!-- \/image-wrap -->\n    \n    \n<\/div>\n<!-- \/module image -->\t        <\/div>\n\t    \t<\/div>\n\t\t    <\/div>\n\t    <!-- \/row_inner -->\n\t<\/div>\n\t<!-- \/module_row -->\n\t\t<!-- module_row -->\n\t<div  data-lazy=\"1\" class=\"module_row themify_builder_row tb_1nsn37 clearfix\" >\n\t    \t\t<div class=\"row_inner col_align_top tf_box tf_w tf_rel\">\n\t\t\t<div  data-lazy=\"1\" class=\"module_column tb-column col-full first tb_0t1f37 tf_box\">\n\t    \t    \t        <div class=\"tb-column-inner tf_box tf_w\">\n\t\t    <!-- module text -->\n<div  class=\"module module-text tb_06r738   \" data-lazy=\"1\">\n            <div  class=\"tb_text_wrap\">\n    <p>When nbn first deployed their services on the existing Telstra HFC network, their services operated in conjunction with existing Telstra services, this period was referred to as \u201cJoint Use\u201d.\u00a0So as to enable nbn to safely connect their services and to provide a point of demarcation, TPS constructed and deployed CSDP panels in all ONS (Optical Node Segmentation) racks and RFC (RF Combiner) racks.\u00a0This was a challenging program to manage, logistically and technically. The CSDP needed to be available prior to nbn intended construction dates and had to work correctly the first time around.<\/p>\n<p>The program commenced in Ocean Reef, Western Australia during April, 2016 and subsequently completed in Reynella on 31\/08\/2017, causing it to operate throughout a 16 month duration. \u00a0The program encompassed a total of 255 network sites and 704 CSDP panel and cable kits.\u00a0The materials required to construct the kits equated to 9,856 isolators, 4,928 double band-pass filters, 19,712 F Connectors and ~16,700 metres of quad shield RG59 HEC coaxial cable.<\/p>\n<p>So as to complete the deployment in an efficient manor, TPS conducted audits at a multitude of network sites to confirm the rack correct location. TPS continues to maintain a stock of all components which would enable the installation of any additional panels if required and assist with any service restoration efforts required.<\/p>    <\/div>\n<\/div>\n<!-- \/module text -->\t        <\/div>\n\t    \t<\/div>\n\t\t    <\/div>\n\t    <!-- \/row_inner -->\n\t<\/div>\n\t<!-- \/module_row -->\n\t<\/div>\n<!--\/themify_builder_content-->","protected":false},"excerpt":{"rendered":"<p>CSDP (Coaxial Service Delivery Point) Installation When nbn first deployed their services on the existing Telstra HFC network, their services operated in conjunction with existing Telstra services, this period was referred to as \u201cJoint Use\u201d.\u00a0So as to enable nbn to safely connect their services and to provide a point of demarcation, TPS constructed and deployed [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":2559,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"footnotes":""},"class_list":["post-2600","page","type-page","status-publish","hentry","has-post-title","has-post-date","has-post-category","has-post-tag","has-post-comment","has-post-author",""],"jetpack_sharing_enabled":true,"builder_content":"<h1 style=\"text-align: center;\">CSDP (Coaxial Service Delivery Point) Installation<\/h1>\n<img src=\"https:\/\/tpsonline.com.au\/wordpress\/wp-content\/uploads\/2021\/05\/Projects-10.1.webp\" alt=\"\" width=\"1000\" height=\"\">\n<p>When nbn first deployed their services on the existing Telstra HFC network, their services operated in conjunction with existing Telstra services, this period was referred to as \u201cJoint Use\u201d.\u00a0So as to enable nbn to safely connect their services and to provide a point of demarcation, TPS constructed and deployed CSDP panels in all ONS (Optical Node Segmentation) racks and RFC (RF Combiner) racks.\u00a0This was a challenging program to manage, logistically and technically. The CSDP needed to be available prior to nbn intended construction dates and had to work correctly the first time around.<\/p> <p>The program commenced in Ocean Reef, Western Australia during April, 2016 and subsequently completed in Reynella on 31\/08\/2017, causing it to operate throughout a 16 month duration. \u00a0The program encompassed a total of 255 network sites and 704 CSDP panel and cable kits.\u00a0The materials required to construct the kits equated to 9,856 isolators, 4,928 double band-pass filters, 19,712 F Connectors and ~16,700 metres of quad shield RG59 HEC coaxial cable.<\/p> <p>So as to complete the deployment in an efficient manor, TPS conducted audits at a multitude of network sites to confirm the rack correct location. TPS continues to maintain a stock of all components which would enable the installation of any additional panels if required and assist with any service restoration efforts required.<\/p>","_links":{"self":[{"href":"https:\/\/tpsonline.com.au\/wordpress\/wp-json\/wp\/v2\/pages\/2600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tpsonline.com.au\/wordpress\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tpsonline.com.au\/wordpress\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/tpsonline.com.au\/wordpress\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tpsonline.com.au\/wordpress\/wp-json\/wp\/v2\/comments?post=2600"}],"version-history":[{"count":12,"href":"https:\/\/tpsonline.com.au\/wordpress\/wp-json\/wp\/v2\/pages\/2600\/revisions"}],"predecessor-version":[{"id":4476,"href":"https:\/\/tpsonline.com.au\/wordpress\/wp-json\/wp\/v2\/pages\/2600\/revisions\/4476"}],"up":[{"embeddable":true,"href":"https:\/\/tpsonline.com.au\/wordpress\/wp-json\/wp\/v2\/pages\/2559"}],"wp:attachment":[{"href":"https:\/\/tpsonline.com.au\/wordpress\/wp-json\/wp\/v2\/media?parent=2600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}